Hospital simulator

HAC Penalty Simulator

HAC Penalty Simulator

FY2026 · counterfactual measure changes (partial-equilibrium)

← All simulations

Counterfactual simulator

SANTA CLARA VALLEY MEDICAL CENTER

CA · Facility ID 050038 · FY2026

Total HAC Score

0.7741

Percentile

89.3th

Displayed status

Payment reduction

From CMS Payment Reduction column (file).

Score vs threshold (0.3792) — simulated position

Score distributionThreshold 0.3792Hospital 0.7741

Hospital score 0.7741. Penalty threshold 0.3792. Distribution of 2929 scored hospitals.

Live result

Equal-weight mean of edited reported Z · threshold 0.3792(strict >) · simulated/illustrative

Simulated Total HAC

0.7741

Δ from file score

+0.0000

File 0.7741

Penalized (simulated)

Measure controls

Drag reported SIRs (PSI-90: Composite Value). Z updates live via the empirical map, clamped to each measure's floor/cap.

  • Composite Value 1.071Z file 0.580sim 0.580
    0.273.32
  • SIR 0.932Z file 0.756sim 0.756
    0.007.96
  • SIR 1.069Z file 1.258sim 1.258
    0.005.52
  • SIR 1.813Z file 1.649sim 1.649
    0.004.79
  • SIR 0.385Z file 0.029sim 0.029
    0.003.32
  • SIR 0.876Z file 0.373sim 0.373
    0.004.41

Solver

Smallest change to clear (or cushion before crossing) the 0.3792 threshold — holding other measures fixed. Simulated/illustrative.

Insufficient data to score — solver unavailable.