HAC Penalty Risk Auditor
FY2026 · structural fragility of Total HAC Scores
Hospital audit
CEDAR CITY HOSPITAL
UT · Facility ID 460007 · FY2026
Total HAC Score
-0.3319
Percentile
30.2th
Displayed status
No reductionFrom CMS Payment Reduction column (file).
Score vs threshold (0.3792)
Hospital score -0.3319. Penalty threshold 0.3792. Distribution of 2929 scored hospitals.
Data completeness
Reported on 3 of 6. Missing measures show N/A with the CMS footnote; footnote 18 values are imputed worst-case, not measured performance.
- PSI-90z -0.426
- CLABSIN/A
- CAUTIN/A
- SSIz 0.892
- CDIz -1.462
- MRSAN/A
Fragility
Each reported measure moves the score by 0.3333 points.
| Measure | Current Z | Score @ floor | Score @ cap | Abs swing |
|---|---|---|---|---|
| PSI-90controls fate | -0.4256 | -0.6845 | 0.6470 | 1.3315 |
| CDI | -1.4622 | -0.3319 | 0.8865 | 1.2184 |
| SSI | 0.8921 | -1.1148 | 0.0946 | 1.2094 |
Swing is a mechanics illustration: replace one reported Z with that measure’s observed floor or cap while holding others fixed. Ranked by absolute swing.
Peer context
Percentile within UT (31 scored): 56.5th
Hospital score -0.3319. Penalty threshold 0.3792. Distribution of 31 scored hospitals.
Percentile among hospitals with 3 reported measures (196 scored): 37.5th
Hospital score -0.3319. Penalty threshold 0.3792. Distribution of 196 scored hospitals.
Plain-language verdict
As scored, the CMS file lists no payment reduction (Total HAC Score -0.3319; threshold 0.3792).
Reported on 3 of 6 measures; each reported measure moves the equal-weighted score by 0.3333 points.
Describes scoring mechanics only. Not medical or legal advice. Any “would / would not” language is an illustration against the published threshold, not a CMS prediction.